The American Universtity South London.
Description: Two 60m Uniline systems in black were installed for safe access to the box gutters.
The Building is listed therefore a system that could not be seen rom ground level was required; the black cable blended in perfectly against the slate roofs.
Jersey Hospital.
Description: 3 Uniline 8mm stainless steel wire based horizontal lifelines were installed to the new standing seam roof on Uniline Force Management Anchors.
The fall restraint systems allowed safe access to the extremities of the roof without the risk of falls with an arrest system and the subsequent rescue problems associated with them.
T K Max, Hatfield, Sharky Roofing.
Description: 200 l/m of Uniline Grey onto a composite roof sheet using Uniline Force Management Anchors.
BBC,White City.
Description: 6 Uniline 16mm Orange fall restraint systems were installed for safe access to clean and maintain the link bridge roofs. The uniline Orange was chosen principally for it Is high visibility and secondly because the system allows for posts in excess of 15m (upto 20m) centres reducing the amount of support posts required and the reduced disruption during installation.
The OCS stand, The Oval – Keyclad Ltd/Taylor Woodrow
Description: Over 600 l/m of Uniline was installed to the main Wing roof and low level roofs during construction of the new stadium.
Working closely with Keyclad is design team, Taylor Woodrow and the Architects, the original fall arrest scheme was scrapped and a fall restraint scheme adopted.
The Uniline systems were installed to ensure falls would not occur from all of the roof levels.
Safetyworks attend site each year to service and maintain the systems on a 5 year rolling contract.