Uniline

Uniline

The OCS stand, The Oval – Keyclad Ltd/Taylor Woodrow

Description: Over 600 l/m of Uniline was installed to the main  Wing  roof and low level roofs during construction of the new stadium.

Working closely with Keyclad is design team, Taylor Woodrow and the Architects, the original fall arrest scheme was scrapped and a fall restraint scheme adopted.

The Uniline systems were installed to ensure falls would not occur from all of the roof levels.

Safetyworks attend site each year to service and maintain the systems on a 5 year rolling contract.