When Syngenta extended their 2 offices vertically, a link bridge was required to join them at high level. Access was still required at low level for farm machinery, therefore large unsupported spans were required beneath.
|
|
|
2 Fire escape staircases were also required to service personnel working in the first floor offices; these were all manufactured in house with designs & loadings provided to us by J.P.P. Design. |
|